CRITICAL RESILIENCECritical Resilience Upgrades
Faryners House London
Multiple projects have been completed over 2013 and 2014 including UPS upgrade& separation works on live infrastructure; upgrades to provide N+1 resilience to the electrical systems re-routing of water services from critical electrical rooms providing new drip trays and leak detection systems.
Works
Included
Separation works on live infrastructure
Upgrades to provide n+1 resilience to the electrical systems
Re-routing of water services from critical electrical rooms
Providing new drip trays and leak detection systems