£7M phased migration of live Tier 3 data centre operations from central London site.
Data centre space was consolidated and the converted space was refurbished as offices.
Data centre space was consolidated and the converted space was refurbished as offices.
Works
Included
Overhauling existing hv turbine generators
Ups consolidation
Ups upgrades to trader floors
Installation of automatic load shedding system
Ups consolidation
Ups upgrades to trader floors
Installation of automatic load shedding system