Loop Engineering were appointed to produce the mechanical design for the refurbishment of office, laboratory and auditorium space. Originally built in 1985 on the National Physical Laboratory’s Teddington campus, Building 84 is home to a number of labs and open plan office space spread across 3 floors. This refurbishment replaced the 80’s mechanical services with new energy efficient services such as new mechanical ventilation with heat recovery units.

Works
Included
Replacement of ventilation system
Replacement of heating and cooling systems
Introduction of cooling in office spaces
Modernisation of LTHW system
Replacement of heating and cooling systems
Introduction of cooling in office spaces