CRITICAL RESILIENCEResilience Upgrade Works
Cannons House Bristol
This project involved upgrading the existing electrical and UPS infrastructure to provide N+1 resilience to 20 Tech and Server Rooms within these existing premises. The brief entailed minimizing disruption to the existing operations and providing a cost effective engineering solution.
Loop Engineering were appointed for the electrical upgrade works.