LEISURE & CULTURERoyal Albert Hall Basement Extension
Full design of new 2000m2 basement extension to include a new bar, new office areas and back of house facilities.
Project entailed connections into existing Grade 1 listed building. Replacement of CHW and Steam infrastructure including the replacement of existing central plant.
A new 3MW boiler room 10 meters underground with smoke extract fans and AHUs. Thanks to a careful 3D design we achieved a very compact plantroom and saved space.
Project entailed connections into existing Grade 1 listed building. Replacement of CHW and Steam infrastructure including the replacement of existing central plant.
A new 3MW boiler room 10 meters underground with smoke extract fans and AHUs. Thanks to a careful 3D design we achieved a very compact plantroom and saved space.




Works
Included
Full MEP design
The design is delivered in 3D using REVIT
Replacement of CHW and Steam infrastructure
Replacement of existing central plant
The design is delivered in 3D using REVIT
Replacement of CHW and Steam infrastructure
Replacement of existing central plant
Project
Summary
LOCATIONLondon, United Kingdom
CLIENTRoyal Albert Hall