HotelLeisure & CultureThe Stafford Hotel Phase 3 MEP design

COMMERCIAL DEVELOPMENTThe Stafford Hotel
Phase 3 MEP design

The 5-star hotel is located in St James's Place, London. Loop Engineering was appointed to provide a Stage 4 design for the refurbishment of rooms on the first floor and within the corridor to improve their overall condition and functionality. This would enhance the experience of the occupants and provide a more comfortable and enjoyable stay.

By replacing the existing MEP services with new and improved ones in the same risers, we were able to seamlessly upgrade the hotel's infrastructure without disrupting operations on other floors.

Works
Included

New cooling to the hotel rooms
New lighting, small power and fire alarms connected into the existing system
New lighting, small power and fire alarms to the communal corridor
Reconfiguration of the existing drainage to suit the new layouts of the hotel rooms

Project
Summary

LOCATIONSt James Place, London, United Kingdom
CLIENTStafford Hotel
Loop Engineering Ltd

Loop Engineering is a M&E building services engineering and design consultancy in London offering Mechanical, Electrical & Public Health Design and MEP Project Management.

Harmsworth House
13-15 Bouverie St
London
EC4Y 8DP
United Kingdom

+44(0) 203 822 0340
info@loopengineering.com

ACCREDITATIONS

ISO 9001:2015
Building services engineering consultancy

ISO 9001 ACCREDITATION

ISO 19650-2:2018
Building services engineering consultancy, inclusive of Mechanical design, Electrical design, Public health design (MEP) and MEP project management service for clients within the UK.

ISO 19650

© Loop Engineering 2023 All rights reserved