COMMERCIAL PROJECTMicrosoft
Accelerator
MEP Design
Loop Engineering undertook the detailed MEP designs for the Cat B fitout for two floors of 70 Wilson Street for the Microsoft Accelerator project.
Works included enhancing the basebuild ventilation, cooling systems and introducing new underfloor power and data systems. CO2 sensing and VAV boxes were introduced to maximise the limited fresh air capacity and move it areas in use.
Works included enhancing the basebuild ventilation, cooling systems and introducing new underfloor power and data systems. CO2 sensing and VAV boxes were introduced to maximise the limited fresh air capacity and move it areas in use.
Works
Included
Detailed MEP design
Enhancement of basebuild ventilation and cooling systems
Introduction of new underfloor power and data systems
Enhancement of basebuild ventilation and cooling systems
Introduction of new underfloor power and data systems