RESIDENTIAL DEVELOPMENTAlperton London Full MEP Design
The project includes the development of 4 high-rise residential blocks, ground floor public house, retail and workspace units.
We are appointed for detailed design duties up to Stage 4B producing fully coordinated layouts for electrical, mechanical, public health, and vertical transportation services. The design will be delivered in 3D using REVIT 2020. The services strategy includes Air-source heatpumps and boilers in an Energy Centre, supplying all 4 blocks.

Works
Included
The design is delivered in 3D using REVIT 2020