CRITICAL RESILIENCEResilience Upgrade Works
Cannons House Bristol
This project involved upgrading the existing electrical and UPS infrastructure to provide N+1 resilience to 20 Tech and Server Rooms within these existing premises. The brief entailed minimizing disruption to the existing operations and providing a cost effective engineering solution.
Loop Engineering were appointed for the electrical upgrade works.
Loop Engineering were appointed for the electrical upgrade works.
Works
Included
Electrical and UPS infrastructure design
Project
Summary
LOCATIONBristol, United Kingdom
CLIENTBanking Client